In a specification, small words carry obligations. "Shall", "should" and "may" divide what the contractor must do, what is recommended and what is allowed, and a translation that blurs them changes the scope of the work.
Obligation words, mapped once
| English wording | Meaning in a specification | What we do |
|---|---|---|
| shall | Mandatory requirement | One fixed rendering, used everywhere |
| should | Recommendation | A distinct, weaker rendering |
| may | Permission or option | Kept apart from "shall" and "should" |
| unless otherwise approved | Exception needing sign-off | Condition and approver preserved |
Before translating, we agree this mapping with you and apply it to the whole package, including sections written by different authors. Inconsistent obligation words are one of the first things a reviewer compares.
A package is many authors in one voice
A specification set is typically assembled from sections written by different disciplines: civil, structural, mechanical, electrical, finishing. Each uses its own vocabulary, and the same material can be named differently in two sections. We build the term base from the whole package first, then translate section by section against it, so concrete, steel, piping and cable terms read the same in every discipline.
Source (illustrative)
"Welds shall be inspected in accordance with the referenced standard, unless otherwise approved by the Engineer."
Three things must survive: the obligation, the reference to the standard as named, and the party who can approve an exception.
Quantities, ranges and tolerances
- Numbers and units compared automatically with the source, including thicknesses, strengths, spacing and temperatures.
- Ranges and limits. "Not less than", "up to" and "between" keep their direction.
- Standards. Designations and clause numbers locked and checked.
- Cross-references. Section numbers and "see clause" references verified after translation.
- Tables and schedules. Row and column structure unchanged, so rows can be compared with the source.
Materials, products and equivalents
Specifications name materials and products in careful phrases: "or approved equivalent", "as manufactured by", "minimum grade", "to the satisfaction of". The phrase decides whether a contractor may substitute a product and who approves it. We keep each of these phrases consistent through the package and ask you for the intended meaning if the source uses them loosely.
Product names, trade names and type designations stay as they are written. Only the descriptive text around them is translated. If a material has an established local name that your site teams use, send it with the term list, and we use it throughout instead of a literal rendering.
Method statements and inspection and test plans are close relatives of the specification. They often repeat its clauses in shorter form, so we translate them from the same term base. This keeps the inspection checklist and the specification clause it checks aligned, which is easier to verify than two documents that drifted apart.
Addenda and revisions
Specifications are revised during a project, and addenda arrive when the team is busy. Translation memory compares the new version with the approved translation, so only changed clauses are translated and reviewed, and unchanged wording stays identical. Please send revisions with changes marked if you have them, along with the list of clauses your team considers critical, so that reviewers give those the closest comparison.
Quotes are per source word. Because specifications repeat boilerplate between sections and between projects, we run a repetition analysis first and share it with the quote, so you see which text is new and which is reused before any work begins. Every project is under NDA and files are encrypted and access-controlled.
Our broader technical translation services cover the full range of engineering documents. Related pages: engineering drawing translation for the drawings that accompany a specification, and tender document translation for bid packages that quote it. Read more in our technical translation articles.
Questions buyers ask
Which construction documents do you translate?
Technical specifications, scope of work descriptions, material and equipment requirements, method statements, inspection and test plans, and the technical annexes of contracts.
How do you handle references to standards?
Standard designations and clause numbers are kept as written. Only the surrounding sentence is translated, and we do not substitute a different standard.
Can you keep the section numbering?
Yes. Section and clause numbers are locked, so cross-references still point to the right place after translation.
Do you translate drawings that come with the specification?
Notes and callouts on drawings can be translated in the source file; see our engineering drawing translation page for how this works.